Scorecard using the PEMM Framework
Student Name
Date
Professor Justin Bateh
Assess your value stream and your organization using the PEMM Scorecard exhibit
Please see the Excel file for the PEMM Scorecard. (Include Excel file with submission)
Discuss your findings, and highlight the strengths and opportunities for improvement.
Based on the PEMM Scorecard, the succinct description of my findings by Process Enablers and
Enterprise Capabilities of the strengths and opportunities for improvement is listed below.
Process Enablers
•
•
•
•
•
Design: (insert succinct statement)
o Purpose: (insert succinct statement)
o Context: (insert succinct statement)
o Documentation: (insert succinct statement)
Performers: (insert succinct statement)
o Knowledge: (insert succinct statement)
o Skill: (insert succinct statement)
o Behavior: (insert succinct statement)
Owner: (insert succinct statement)
o Identity: (insert succinct statement)
o Activities: (insert succinct statement)
o Authority: (insert succinct statement)
Infrastructure: (insert succinct statement)
o Information Systems: (insert succinct statement)
o Human Resource Systems: (insert succinct statement)
Metrics: (insert succinct statement)
o Definition: (insert succinct statement)
o Uses: (insert succinct statement)
Enterprise Capabilities
•
Leadership: (insert succinct statement)
o Awareness: (insert succinct statement)
o Alignment: (insert succinct statement)
o Behavior: (insert succinct statement)
•
•
•
o Style: (insert succinct statement)
Culture: (insert succinct statement)
o Teamwork: (insert succinct statement)
o Customer Focus: (insert succinct statement)
o Responsibility: (insert succinct statement)
o Attitude toward Change: (insert succinct statement)
Expertise: (insert succinct statement)
o People: (insert succinct statement)
o Methodology: (insert succinct statement)
Governance: (insert succinct statement)
o Process Model: (insert succinct statement)
o Accountability: (insert succinct statement)
o Integration: (insert succinct statement)
Develop actionable recommendations for presentation to senior management.
The short-term actionable recommendations are:
•
•
•
(insert succinct statement)
(insert succinct statement)
(insert succinct statement)
The long-term actionable recommendations are:
•
•
•
(insert succinct statement)
(insert succinct statement)
(insert succinct statement)
References
Hammer, Michael, "Process Audit”. https://hbr.org/2007/04/the-process-audit
How Mature Is
Your
ENTERPRISE?
To determine if your organization is ready to support a process-based transformation, evaluate the statements in this table. They show the strength levels, E-1 to E-4,
of the capabilities that enterprises need in order to develop their business processes. If a statement is largely true (at least 80% correct), mark the box with a "G" to
indicate the color green; if it is somewhat true (between 20% and 80% correct), mark the box with a "Y" to indicate the color yellow; and if it is largely untrue (less than
20% correct), mark the box with an "R" to indicate the color red.
G
Y
GREEN: YELLOW:
largely true somewhat
true
E-1
Leadership
Culture
Expertise
Awareness
The enterprise's senior executive team
recognizes the need to improve operational
performance but has only a limited
understanding of the power of business
processes.
Alignment
E-2
At least one senior executive deeply
understands the business process concept,
how the enterprise can use it to improve
performance, and what is involved in
implementing it.
E-3
E-4
The senior executive team views the
enterprise in process terms and has
developed a vision of the enterprise and its
processes.
The senior executive team sees its own work
in process terms and perceives process
management not as a project but as a way of
managing the business.
The leadership of the process program lies in A senior executive has taken leadership of,
the middle management ranks.
and responsibility for, the process program
There is strong alignment in the senior
executive team regarding the process
program. There is also a network of people
throughout the enterprise helping to promote
process efforts.
People throughout the enterprise exhibit
enthusiasm for process management and play
leadership roles in process efforts.
Behavior
A senor executive endorses and invests in
operational improvement.
Senior executives operate as a team, manage The members of the senior executive team
the enterprise through its processes, and are perform their own work as processes, center
actively engaged in the process program.
strategic planning on processes, and develop
new business opportunities based on highperformance processes.
Style
The senior executive team has started shifting The senior executive team leading the
The senior executive team has delegated
from a top-down, hierarchical style to an open, process program is passionate about the need control and authority to process owners and
collaborative style.
to change and about process as the key tool process performers.
for change.
The senior executive team exercises
leadership through vision and influence rather
than command and control.
Teamwork
Teamwork is project focused, occasional, and The enterprise commonly uses crossatypical.
functional project teams for improvement
efforts.
Teamwork is the norm among process
performers and is commonplace among
managers.
Teamwork with customers and suppliers is
commonplace.
Customer focus
There is a widespread belief that customer
focus is important, but there is limited
appreciation of what that means. There is
also uncertainty and conflict about how to
meet customer needs.
Employees understand that customers
demand uniform excellence and a seamless
experience.
Employees focus on collaborating with trading
partners to meet the needs of final customers.
Responsibility
Accountability for results rests with managers. Frontline personnel begin to take ownership of Employees feel accountable for enterprise
results.
results.
Employees feel a sense of mission in serving
customers and achieving ever-better
performance.
Attitude toward
change
There is growing acceptance in the enterprise Employees are prepared for significant
about the need to make modest change.
change in how work is performed.
Employees are ready for major multidimensional change.
Employees recognize change as inevitable
and embrace it as a regular phenomenon.
People
A small group of people has a deep
appreciation for the power of processes.
A cadre of experts has skills in large-scale
change management and enterprise
transformation.
Substantial numbers of people with skills in
process redesign and implementation, project
management, program management, and
change management are present across the
enterprise. A formal process for developing
and maintaining that skill base is also in place.
Methodology
The enterprise uses one or more
Process redesign teams have access to a
methodologies for solving execution programs basic methodology for process redesign.
and making incremental process
improvements.
The enterprise has developed and
standardized a formal process for process
redesign and has integrated it with a standard
process for process improvement.
Process management and redesign have
become core competencies and are
embedded in a formal system that includes
environment scanning, change planning,
implementation, and process-centered
innovation.
The enterprise has identified some business
processes.
The enterprise has developed a complete
enterprise process model, and the senior
executive team has accepted it.
The enterprise process model has been
communicated throughout the enterprise, is
used to drive project prioritization, and is
linked to enterprise-level technologies and
data architectures.
The enterprise has extended its process
model to connect with those of customers and
suppliers. It also uses the model in strategy
development.
Accountability
Functional managers are responsible for
performance, project managers for
improvement projects.
The process owners have accountability for
individual processes, and a steering
committee is responsible for the enterprise's
overall progress with processes.
The process owners share accountability for
the enterprise's performance.
A process council operates as the seniormost
management body; performers share
accountability for enterprise performance and
the enterprise has established steering
committees with customers and suppliers to
drive interenterprise process change.
Integration
One or more groups advocate and support
possibly distinct operational improvement
techniques.
An informal coordinating body provides
needed program management while a
steering committee allocates resources for
process redesign projects.
A formal program management office, headed
by a chief process officer, coordinates and
integrates all process projects, and a process
council manages interprocess integration
issues. The enterprise manages and deploys
all process improvement techniques and tools
in an integrated manner.
The process owners work with their
counterparts in customer and supplier
enterprises to drive interenterprise process
integration.
Governance Process model
A senior executive has publicly set stretch
performance goals in customer terms and is
prepared to commit resources, make deep
changes, and remove roadblocks in order to
achieve those goals.
Employees realize that the purpose of their
work is to deliver extraordinary customer
value.
A cadre of experts has skills in process
redesign and implementation, project
management, communications, and change
management.
E-1
E2
R
RED:
largely
untrue
E-3
E-4
How Mature Are
Your
PROCESSES?
You can evaluate the maturity of a business process and determine how to improve its performance by u
defining the strength levels, from P-1 to P-4, for each enabler apply to the process that you are assessin
correct), mark the box with a "G" to indicate the color green; if it is somewhat true (between 20% and 80
the color yellow; and if it is largely untrue (less than 20% correct), mark the box with an "R" to indicate th
P-1
Design
Performers
Owner
P-2
P-3
Purpose
The process has not been designed on an end-toend basis. Functional managers use the legacy
design primarily as a context for functional
performance improvement.
The process has been redesigned from end-to-end The process has been designed to fit w
enterprise processes and with the ente
in order to optimize its performance.
systems in order to optimize the enterp
performance.
Context
The process's inputs, outputs, suppliers, and
customers have been identified.
The needs of the process's customers are known
and agreed upon.
The process owner and the owners of
processes with which the process inter
established mutual performance expec
Documentation
The documentation of the process is primarily
functional, but it identifies the interconnections
among the organizations involved in executing the
process.
There is end-to-end documentation of the process
design.
The process documentation describes
interfaces with, and expectations of, ot
processes and links to process to the e
system and data architecture.
Knowledge
Performers can name the process they execute and Performers can describe the process's overall flow;
how their work affects customers, other employees
identify the key metrics of its performance.
in the process, and the process's performance; and
the required and actual performance levels.
Skills
Performers are skilled in problem solving and
process improvement techniques.
Performers are skilled in teamwork and selfmanagement.
Behavior
Performers have some allegiance to the process,
but owe primary allegiance to their functions.
Performers try to follow the process design, perform Performers strive to ensure that the pro
it correctly, and work in ways that will enable other the results needed to achieve the ente
people who execute the process to do their work
effectively.
Identity
The process owner is an individual or a group
informally charged with improving the process.
Enterprise leadership has created an official process The process comes first for the owner
owner role and has filled the position with a senior time allocation, mind share, and perso
manager who has clout and credibility.
Activities
The process owner works with other pr
The process owner articulates the process's
The process owner identifies and documents the
owners to integrate processes to achie
process, communicates it to all the performers, and performance goals and a vision of its future;
sponsors redesign and improvement efforts; plans enterprise's goals.
sponsors small-scale change projects.
their implementation; and ensures compliance with
the process design.
Authority
The process owner lobbies for the process but can The process owner can convene a process redesign The process owner controls the IT syst
team and implement the new design and has some support the process and any projects t
only encourage functional managers to make
control over the technology budget for the process. the process and has some influence ov
changes.
assignments and evaluations as well a
process's budget.
Infrastructure Information
Systems
Fragmented legacy IT systems support the process. An IT system constructed from functional
components supports the process.
Performers are familiar both with funda
business concepts and with the drivers
performance and can describe how the
affects other processes and the enterp
performance.
Performers are skilled at business dec
An integrated IT system, designed with
in mind and adhering to enterprise stan
supports the process.
Hiring, development, reward, and reco
The process's design drives role definitions, job
Human Resource Functional managers reward the attainment of
functional excellence and the resolution of functional descriptions, and competency profiles. Job training systems emphasize the process's need
Systems
and balance them against the enterpris
is based on process documentation.
problems in a process context.
Metrics
Definition
The process has some basic cost and quality
metrics.
The process has end-to-end process metrics
derived from customer requirements.
The process's metrics as well as cross
metrics have been derived from the en
strategic goals.
Infrastructure Information
Systems
Fragmented legacy IT systems support the process. An IT system constructed from functional
components supports the process.
An integrated IT system, designed with
in mind and adhering to enterprise stan
supports the process.
Human Resource Functional managers reward the attainment of
The process's design drives role definitions, job
Hiring, development, reward, and reco
Systems
functional excellence and the resolution of functional descriptions, and competency profiles. Job training systems emphasize the process's need
problems in a process context.
is based on process documentation.
and balance them against the enterpris
Metrics
Definition
The process has some basic cost and quality
metrics.
The process has end-to-end process metrics
derived from customer requirements.
The process's metrics as well as cross
metrics have been derived from the en
strategic goals.
Uses
Managers see the process's metrics to track its
performance, identify root causes of faulty
performance, and drive functional improvements.
Managers use the process's metrics to compare its
performance to benchmarks, best-in-class
performance, and customer needs and to set
performance targets.
Managers present the metrics to proce
performers for awareness and motivati
dashboards based on the metrics for d
management of the process.
maturity of a business process and determine how to improve its performance by using this table. Decide how the statements
vels, from P-1 to P-4, for each enabler apply to the process that you are assessing. If a statement is largely true (at least 80%
with a "G" to indicate the color green; if it is somewhat true (between 20% and 80% correct), mark the box with a "Y" to indicate
it is largely untrue (less than 20% correct), mark the box with an "R" to indicate the color red.
P-2
P-3
P-4
The process has been designed to fit with customer
and supplier processes in order to optimize
interenterprise performance.
signed on an end-togers use the legacy
for functional
The process has been redesigned from end-to-end The process has been designed to fit with other
enterprise processes and with the enterprise's IT
in order to optimize its performance.
systems in order to optimize the enterprise's
performance.
s, suppliers, and
ed.
The needs of the process's customers are known
and agreed upon.
The process owner and the owners of the other
processes with which the process interfaces have
established mutual performance expectations.
The process owner and the owners of customer and
supplier processes with which the process
interfaces have established mutual performance
expectations.
ocess is primarily
interconnections
olved in executing the
There is end-to-end documentation of the process
design.
The process documentation describes the process's
interfaces with, and expectations of, other
processes and links to process to the enterprise's
system and data architecture.
An electronic representation of the process design
supports its performance and management and
allows analysis of environmental changes and
process reconfigurations.
ocess they execute and Performers can describe the process's overall flow;
how their work affects customers, other employees
performance.
in the process, and the process's performance; and
the required and actual performance levels.
Performers are familiar with the enterprise's industry
Performers are familiar both with fundamental
business concepts and with the drivers of enterprise and its trends and can describe how their work
affects interenterprise performance.
performance and can describe how their work
affects other processes and the enterprise's
performance.
Performers are skilled at business decision making. Performers are skilled at change management and
change implementation.
blem solving and
ques.
Performers are skilled in teamwork and selfmanagement.
ance to the process,
o their functions.
Performers try to follow the process design, perform Performers strive to ensure that the process delivers Performers look for signs that the process should
it correctly, and work in ways that will enable other the results needed to achieve the enterprise's goals. change, and they propose improvements to the
process.
people who execute the process to do their work
effectively.
vidual or a group
oving the process.
Enterprise leadership has created an official process The process comes first for the owner in terms of
owner role and has filled the position with a senior time allocation, mind share, and personal goals.
manager who has clout and credibility.
The process owner works with other process
The process owner articulates the process's
and documents the
owners to integrate processes to achieve the
all the performers, and performance goals and a vision of its future;
sponsors redesign and improvement efforts; plans enterprise's goals.
projects.
their implementation; and ensures compliance with
the process design.
The process owner is a member of the enterprise's
senior-most decision-making body.
The process owner develops a rolling strategic plan
for the process, participates in enterprise-level
strategic planning, and collaborates with his or her
counterparts working for customers and suppliers to
sponsor interenterprise process redesign initiatives.
The process controls the process's budget and
or the process but can The process owner can convene a process redesign The process owner controls the IT systems that
team and implement the new design and has some support the process and any projects that change exerts strong influence over personnel assignments
anagers to make
control over the technology budget for the process. the process and has some influence over personnel and evaluations.
assignments and evaluations as well as the
process's budget.
ms support the process. An IT system constructed from functional
components supports the process.
An integrated IT system, designed with the process An IT system with a modular architecture that
adheres to industry standards for interenterprise
in mind and adhering to enterprise standards,
communication supports the process.
supports the process.
Hiring, development, reward, and recognition
Hiring, development, reward, and recognition
The process's design drives role definitions, job
the attainment of
resolution of functional descriptions, and competency profiles. Job training systems emphasize the process's needs and results systems reinforce the importance of intra- and
and balance them against the enterprise's needs. interenterprise collaboration, personal learning, and
is based on process documentation.
xt.
organizational change.
cost and quality
The process has end-to-end process metrics
derived from customer requirements.
The process's metrics as well as cross-process
metrics have been derived from the enterprise's
strategic goals.
The process's metrics have been derived from
interenterprise goals.
ms support the process. An IT system constructed from functional
components supports the process.
An integrated IT system, designed with the process An IT system with a modular architecture that
in mind and adhering to enterprise standards,
adheres to industry standards for interenterprise
supports the process.
communication supports the process.
the attainment of
The process's design drives role definitions, job
Hiring, development, reward, and recognition
Hiring, development, reward, and recognition
resolution of functional descriptions, and competency profiles. Job training systems emphasize the process's needs and results systems reinforce the importance of intra- and
xt.
is based on process documentation.
and balance them against the enterprise's needs. interenterprise collaboration, personal learning, and
organizational change.
cost and quality
The process has end-to-end process metrics
derived from customer requirements.
The process's metrics as well as cross-process
metrics have been derived from the enterprise's
strategic goals.
metrics to track its
uses of faulty
onal improvements.
Managers use the process's metrics to compare its
performance to benchmarks, best-in-class
performance, and customer needs and to set
performance targets.
Managers present the metrics to process
Managers regularly review and refresh the process's
performers for awareness and motivation. They use metrics and targets and use them in strategic
dashboards based on the metrics for day-to-day
planning.
management of the process.
The process's metrics have been derived from
interenterprise goals.
it with customer
ptimize
of customer and
rocess
performance
process design
gement and
anges and
erprise's industry
w their work
anagement and
ocess should
ments to the
he enterprise's
ng strategic plan
prise-level
with his or her
and suppliers to
esign initiatives.
budget and
nel assignments
cture that
erenterprise
s.
cognition
intra- and
al learning, and
erived from
G
Y
GREEN: YELLOW:
largely true somewhat
true
P-1
P-2
R
RED:
largely
untrue
P-3
P-4
cture that
erenterprise
s.
cognition
intra- and
al learning, and
erived from
esh the process's
strategic
Introduction
As Michael Hammer shares in his Harvard Business Review Tool Kit – The Process Audit, process
management has become a “way of life” for businesses. Using the PEMM tool and through evaluation
of the maturity of an organizations processes and enterprise, we can gage the organizations ability to
deliver high performance over time. As you will see in my deeper dive into Acme, Inc’s HR process
optimization project, called myHR, we have our fair share of opportunities in both areas of process
enablers and enterprise maturity.
Findings
Process Enablers
Design. We have many gaps in this section. Our HR processes were designed around the triple
carbon copy pads of paper. Historically, each function has focused on their section of the processes and
if their part of the process was functioning properly, they left it alone. The customer (employees) in this
case had more influence on the process, even if their influence made no sense. In the initial stages of
HR process optimization, we’ve identified the core processes, inputs, outputs, customers, and this is
modeled by my submission of Project A – the Value Stream Map for the Voluntary Termination of
Employees. As the process owner, I have clear direction on the expectations of the process. There are
no documented processes at this time.
Performers. We have come out better than I expected in this section with an even amount of
fits and gaps. In 2014, HR recognized that they couldn’t ask the business to improve, if they were not
reflecting on where they can improve as a function. In 2015, the HRIS function was made official and
now there are three employees dedicated to process optimizations. This group is led by me, and I bring
over ten years of experience in process improvement and change management. While the team is not
as versed, they are committed to delivering results that better the function and the organization.
Owner. We have come out better than I expected in this section with an even amount of fits
and gaps. The HR Process Improvement, myHR, project is headed by me and this is my first priority
through completion. The myHR implementation is also on my objectives for the year, showing
leadership’s strong alignment to, and authority granted to me for a successful rollout. myHR is powered
by Workday and HRIS holds all controls over this HRIS Software.
Infrastructure. We have many gaps in this section. Acme, Inc. grew quickly and the IT systems
that support the business took a back seat, causing us to be behind in that functional area. Our systems
are fragmented and at times do not work together. The external experience of the IT team is minimal
and our systems continue to lag. There are no reward and recognition programs in place for the HR
Process improvement project.
Metrics. We have many gaps in this section. As project owner, I know what metrics we need to
be tracking, but there are currently no metrics actively tracked, outside of system cost. Our middle
management has many years of service and have never really reviewed, or been responsible for
reviewing, process metrics.
Enterprise Capabilities
Leadership. To my surprise, we are well ahead of the game in this section. The executive and
non-executive leadership team recognize and understand how the implementation of myHR, will
improve the HR function and allow HR to focus on strategic initiatives. The VP of HR and VP of IT are
both on the project team to ensure roadblocks are removed and progress continues.
Culture. We have many gaps in this section. HR is functioning in silos and it causes issues when
we try to improve processes that are cross functional. We are also challenged by accountability and
with our length of tenure, there is a constant fear of being blamed for something. As an organization,
employees don’t speak highly of change, and in HR, we follow suit. Often times the HR team becomes
protective of their work, causing the silos and negating the progress made or planned.
Expertise. We have some gaps and mostly fits in this area. As the process, project owner, I
bring the expertise needed to implement myHR, and optimize the processes like Voluntary
Terminations. There are no others that have the same skills, and as an organization we have no
methodology for tracking or monitoring a project like this.
Governance. We have many of gaps this section. We think know what processes we need to
optimize, but we really are not sure – since we have never identified all of the processes HR performs
before. We currently do not have an accountability system in place to ensure leaders are following the
proper steps for the HR processes, and very few support the change to myHR as they do not see it as an
improvement in HR’s processes.
Recommendations
Design. As an HR Function, I recommend we focus significant efforts on the design of our
processes. We need to identify all of the processes we perform, system and non-system. Additionally,
as indicated in my Project Charter and Kaizen Event Agenda for the Involuntary Terminations,
documentation is currently non-existent and will need to be a key focus of this project. With customer
input, we can design a well-rounded, customer centric process that also allows HR to become a strategic
partner with the business.
Culture. HR leadership needs to enlist the organizations leadership team in driving the culture
of change. The organizations leadership brings solid awareness, alignment and displays behaviors and
styles that support and recognize the need to change, and I recommend we tap into that. This will help
the HR function be more responsive to change, become customer centric, holds themselves accountable
and build a strong team by building a team to redesign the HR processes.
Governance and Metrics. I recommend we deploy process governance and couple that with the
implementation of supporting metrics to closely follow the progress of the project. This will also provide
insight to the project team and leadership as to how well the project is performing. I also recommend
we teach our middle level leadership how to interpret and use the metrics provided; including the full
HR function.
Conclusion
Acme, Inc. HR has their work cut out for them, but with strong support from the organization
leaders, and HR’s leadership, we can begin to recognize some of the benefits I mention in my Project
Charter, Project C, as we create processes that live up to the organizational expectations. As we see
significant improvement in our HRIS processes with the implementation of myHR, this can motivate
other sub-functions in HR to review and improve their processes; creating a snowball effect of process
improvement in HR.
Value Stream Mapping and Analysis:
Part A
Daymon Jackson
Florida State College at Jacksonville
Professor Justin Bateh
Operational Decision Making
1/14/2020
Title: JAX Shipping HUB 15
Takt time: Demand Rate: 250,200 average orders
monthly
Current State Value Stream Map
Weekly Order
Monthly Order
Production
Control
Supplier
Custome
r
Production Flow
Product
Received
2 people
Inspection
2 People
Unload/
Transfer
3 People
Sort
3 People
Load
5 People
Order Final
Inspection/pick
up
2 People
0 days
0 days
1 days
1 days
1 days
1 days
2 min
90
5 minutes
75
60 min
60
45 min
60
120 min
75
20 min
90
1 days
120 min
1 days
20 min
0 days
2 min
0 days
5 min
1 days
60 min
1 days
45 min
Summary Metrics Calculations
Process
Number
Lead Time (LT)
Process Time (PT)
% Complete &
Accurate
Product Received
1
0
2
90
Inspection
2
0
5
75
Unload/Transfer
3
1
60
60
Sort
4
1
45
60
Hard lines filled
5
1
120
75
Order Final Inspection
6
1
20
90
Process
Activity Ratio
=
0.04375=
=
TOTAL
6
4 (5,760 min)
252
16.4
* Total LT and PT are calculated by summing the LT and PT values for all processes.
** Total %C&A is the Rolled %C&A, which is calculated by multiplying the %C&A for all processes.
Total Process Time
Total Lead Time
4.37%
252
5,760
Value Stream Current State Overview
This value stream map geared toward the handling of product within the distribution warehouse. From shipping delivery truck to
the customers hands. Level 1 of the process, the order is received. Here it is unloaded off the shipping truck. %C&A at level 1 is
at 90. Level 2 is where the inspection of the product is completed. The process time for the inspection is 5 minutes which might
explain such why the %C&A is at 75. Level 3 is where the where the product is unloaded. The process time for this level is 60
minutes, which isn’t bad but not good. Level 4 is where the product that has been unloaded off the truck is sorted. The process
time for this level is at 45 minutes, which is terrible. The product should be sorted and sent on its way to its destination in under 10
minutes. Level 5 is where the product has reached its destination within the hub and is loaded onto another shipping truck to be
delivered to the customer. The process time for this level is at 120 minutes which is highly unacceptable, this process with 5
people should be completed in under 40 minutes. Level 6 is the final inspection, which is to ensure all product has been loaded
onto the truck.
To start, the total time lead is at 4 days and the activity ratio is at 4.37. This could use huge improvement being is that we are an 7
days a week open factory. We should have product unloaded, inspected, sorted, and reloaded for delivery to customer in one days
worth work. Our home office is aware of the delayed process and is taking appropriate matters to ensure that this is corrected at
once.
Last challenge is that the rolled percent complete and accurate (%C&A) is at 16.4. Quality of or products isn’t an issue. During
processes 3 and 4 there seems to be a ton of slack. There seems to be an issue where product get misplaced, lost and/or
damaged during these processes.
Find a way to push product's through the line with less lead time. The problem could be we lack enough employees to get this job
done in a timely manner.
The inspection of the products received should be conducted after the unload process, this will ensure that all product is being
accounted for more accurately.
Detailed Agenda(s) for Kaizen or Work-Outs Part B
Student Name: Daymon Jackson
Date: 1/21/2020
Professor: Justin Bateh
1) List the potential Kaizen events, select the one to be deployed and justify your selection.
Then, define the Kaizen objective and scope for the selected event.
Change the order between processes #2 and #3: The inspection of the products should be
done right after the unload process finishes. The waiting time between processes should
decrease and Product Receiving, Inspection, and Unload should occur in the same day.
Improve the %C&A in process #3: Unload/Transfer has a %C/A of 60% which is
unacceptable. Process Time is not the best, but it is acceptable.
Improve the %C&A in process #4 and reduce the Time Process: Sort has a %C&A of
60%, and a Process time of 45 minutes. This is the first bottleneck in the process. The Lead
Time should be 0.
Reduce Process Time in process #5: The second bottleneck of the logistic operation looks
related to the precedent process. To reduce the Hard Lines Filled Process Time the Sort
process should improve.
Increase the total %C&A: The increment in the %C&A in process #3 and #4 will result in
an increment of the total %C&A. Processes #2 and #5 should also improve the %C&A.
Reduce the total Lead Time to 0: Processing an order should finish in the same day. From
Product Receiving to the Order Final Inspection the Lead Time should be equal to the
Process Time.
The chosen Kaizen event is Improve the %C&A in process #4 and reduce the Time
Process.
The justification for selecting this Kaizen event
The Sorting process in the warehouse creates the first bottleneck in the logistics operation. It
needs to improve in order to increase the %C&A of the process and the total %C&A. An
improved sorting process will also reduce the time needed to sort the orders.
The Kaizen objective
Reduce the Muda in process #4. A 5S Kaizen workshop will increase the efficiency of the
process, because of the reduction of misplaced products, the reduction of walking distance,
and improvement of the %C&A. Besides, an improved Sorting process will facilitate the
reduction of the Process Time of the Hard Lines Filled process. 5S describes how to organize
and lay out a space for maximum efficiency and effectiveness by identifying, sorting and
storing the products, and maintaining the area and items to help sustain the newly organized
areas.
5S events are a great way to get work spaces organized and decluttered. The results are
immediate, which builds excitement from the team to take on future improvements. At the
end of the event, the team will be through the Sweep and will have some standardization in
place, along with a draft of the sustainment plan. (Coimbra, 2013; Planning and running
Kaizen Events, n.d.)
The Kaizen event’s scope
This event should be directed to the whole team of the warehouse, but focused on the Sort
team firstly, secondly to the Unload/Transfer and Hard Lines Filled teams, and finally to the
Product Receiving team and both Inspection teams. It will also involve the management of
the warehouse and the cleaning service. (Planning and running Kaizen Events, n.d., p. 5;
Tools for 5s Lean Manufacturing | Process, checklists and more | Graphic Products, n.d.)
2) Develop a detailed agenda for each Kaizen event.
Day 1
Time
Session
Topic/Objective
30
Kickoff: Welcome
minutes and Explanation of
the objectives of
the workshop
Lean Tools
2 hours
Waste
Walkthrough
Explanation of the
problems found in
the Sorting Process
30
Brainstorming
minutes possible solutions.
VSM
List of problems’
priorities
Root-Cause
analysis
List of possible
solutions
1 hour
Key
Performance
Indicators
List of solutions in
descendent order,
from the best
solution to the
worst.
Mistake
Proofing
SMART
objectives
Improved design of
the warehouse
layout and the
sorting process
3 hours
Day 2
Discussion of the
proposed solutions
Lunch
Designing an
improved layout to
sort the products
Output/Deliverables Rationale
The 5 Whys
The participants
need to know what is
expected from them
after completing the
workshop
The participants
should understand
the problems
presented in the
process.
The team must
engage the change
participating in the
planning of the
solution.
The team will assess
the pros and cons of
the proposed
solutions.
The list of solutions
and the inputs from
the team should
provide the best
design for the layout
of the warehouse.
Time
Session
Topic/Objective
30
Explain the
minutes necessity of
keeping the
workspace tidy
Lean Tools
Output/Deliverables Rationale
Root-Cause
Analysis
Sorting ideas
Labelling systems
30
Engage the
minutes cleaning crew in
the improvement
process
Visual
Management
Cleaning plan
3 hours
Right First
Time
Standardized
work
Yamazumi
Boards
Lead Time
Reduction
2 hours
1 hour
Training exercise
testing the new
layout design
Lunch
Assessment of the
test
Set up the goals for
the first follow up
30
Closing of the
minutes workshop
Visual
Management
Evaluation Report
Improvement plan
Prepare Report Out
Presentation
DMAIC
SMART
goals
List of goals for the
first follow-up
A tidy workspace
means less errors
and the
improvement of the
%C&A.
Cleaning crew is a
substantial part of
the 5S event. They
have the
responsibility of
keeping the place
clean and in order.
The team should
learn how to use the
new design,
measuring the time
used to perform the
task and the %C&A.
The team should be
able to evaluate the
best methods to
perform the tasks
and produce an
improvement plan
The team should
know the goals and
the ways to measure
the accomplishment
Workshop Quality
Survey
3a) Explain your choice for number of days, sequence for session topics, and justify the Lean
tools to be used and outputs from each session.
Number of days: Most 5S Kaizen workshops can have great outcomes with 2 days of
training. However, 5S means a substantial change in the worker’s routine, so a close
supervision and follow-ups should be performed.
Sequence for Session Topics:
First Session:
Explanation of the reason of the workshop and the objectives.
Discussion of the problems found in the sorting process
Brainstorming possible solutions.
Discussion of the proposed solutions.
Designing an improved layout to sort the products
Second Session:
Explain the necessity of keeping the workspace tidy.
Engage the cleaning crew in the improvement process
Training exercise testing the new layout design
Assessment of the test
Set up the goals for the first follow up
Lean Tools:
The Five Whys
Mistake proofing
Visual management
Root-Cause analysis
VSM
Right first time
Key Performance Indicators
SMART objectives
Standardized work
Yamazumi Boards
Lead Time Reduction
DMAIC
(32 Lean Essentials—A List of Lean Tools | Graphic Products, n.d.; Tools for 5s Lean
Manufacturing | Process, checklists and more | Graphic Products, n.d.; Coimbra,
2013)
Session Outputs:
First Session:
List of problems’ priorities
List of possible solutions
List of solutions in descendent order, from the best solution to the worst.
Improved design of the warehouse layout and the sorting process
Second Session:
Sorting ideas
Labelling systems
Cleaning plan
Evaluation Report
Improvement plan
List of goals for the first follow-up
Prepare Report Out Presentation
Workshop Quality Survey
3b) Show how your Kaizen agenda supports the Kaizen objective and scope
for the event. This discussion should be specific to your value stream and organization.
How Session Supports Kaizen Agenda and Scope:
The overall objective of the Kaizen Workshop is to improve the performance of the Sort
Team and fix the bottleneck the untidy process is causing to the rest of the processes. Hence,
the 5S event is recommended. It means that the warehouse team has to design methods to
keep the workspace neat and clean, using an intelligent design of the layout and organizing
the availability of the tools and devices needed for the work. All the teams working in the
warehouse will benefit from the outcomes of the 5S event. Besides, the involvement of the
whole crew will guarantee the accomplishment of the objectives.
Sorting process not only takes a lot more time than needed, but also complicates the
performance of the rest of the teams, generating a long process time in the Hard Lines Filled
process and hindering the quality of the work. The redesign of the process using the 5S
workshop will ensure the reduction of the defects and process time. It will also improve total
quality of the logistics process and reduce the Lead Time to less than one day incrementing
the activity ratio from 4.37% to 17.50%. (Coimbra, 2013; The 5-S System, n.d.)
References
32 Lean Essentials—A List of Lean Tools | Graphic Products. (n.d.). Retrieved January 26,
2020, from https://www.graphicproducts.com/infographics/32-lean-essentials/
Coimbra, E. (2013). Kaizen in Logistics and Supply Chains. McGraw-Hill Professional.
http://www.myilibrary.com?id=513814
Planning and running Kaizen Events. (n.d.). Lean Manufacturing Tools. Retrieved January
26, 2020, from https://leanmanufacturingtools.org/625/planning-and-running-kaizenevents/
The 5-S System: A “How to” Guide. (n.d.). Retrieved January 26, 2020, from
/Read/10383/effective-5s-program
Tools for 5s Lean Manufacturing | Process, checklists and more | Graphic Products. (n.d.).
Retrieved January 26, 2020, from https://www.graphicproducts.com/articles/tools-for5s-lean-manufacturing/
Running head: SIX SIGMA PROJECT CHARTER
1
Six Sigma Project Charter
Daymon Jackson
Florida State College at Jacksonville
Justin Bateh
2/5/2020
SIX SIGMA PROJECT CHARTER
2
Project Charter
Project name:
JAX Shipping HUB 15
Problem statement:
Time management in JAX Shipping HUB 15 is terrible. Product unloading takes 60
minutes, which is not good; product sorting takes 45 minutes, loading products to another
truck that delivers o customers takes 120 minutes, which is not acceptable. The whole
process takes 4 days, which is a big delay.
Goal statement:
Carrying out the unloading, inspecting, sorting using the least time possible, allowing for
delivery in one day.
Project scope:
In-scope: delays during an inspection, products getting lost or misplaced, product
damages, lack of enough employees.
Out-of-scope: Order delays, slow delivery from company to customers.
CTQs of processes within project scope:
Conduct inspection of products to ensure products are accounted for.
Increase efficiency in level 3 and 4, which is unloading and sorting, reducing delay and
damages of products.
SIX SIGMA PROJECT CHARTER
3
Increase the number of employees to avoid delays of processes.
KEY METRIC
Reduce the lead time to less than one day incrementing the activity ratio from 4.37% to
17.50%. Increase % C&A in unloading level to increase total C&A. Improving sort
process (4) to reduce the hardline filled process.
Expected benefits:
Operational:
Reduce the time used from receiving the order to delivering products to customers.
Increasing accountability of every product.
Reducing product wastage, damages, and losses.
Increasing overall process performance.
Financial:
Saving the cost of damaged goods.
Increase the number of products delivered in a day, therefore increasing the number of
orders taken in a day; more products sold, more profits made.
Milestones
These are the project milestones while using the DMAIC (Define-Measure-Analyze-ImproveControl) method.
Action
Step
Due date
SIX SIGMA PROJECT CHARTER
Presentation of the project
Weekly meeting to explain
charter.
project scope and problem
4
5th January, 2020.
identified.
Value stream mapping
Hold weekly meetings on
Discussing current state.
Monday mornings for one
27th January.
and a half hours to analyze
the current processes.
Five Whys
Hold weekly meetings on
3rd February.
Monday mornings for one
and a half hours to analyze
the problem at hand.
Smart
Hold weekly meetings on
objectives/VSM/planning
Monday mornings for 3 hours
24th February
to create and implement a
plan that would improve the
current state.
Mistake proofing and testing
Hold weekly meetings on
9th March
Monday mornings for one
and half hours to discuss the
mistakes discovered during
testing and seeking solutions.
Six sigma
Hold weekly meetings on
Monday mornings for one
16th march
SIX SIGMA PROJECT CHARTER
5
hour to verify the success of
the six sigma.
Key performance indicators/
Hold weekly meetings on
validate /Project closure
Monday mornings for 3 hours
6th April
to discuss the performance of
the new processes, validate
and close the project.
PROJECT CHAMPION:
C.E.O, Operations Manager, H.R.
Project leader:
Operations Manager.
Project team members:
Receiving team, loading and unloading team, sorting team, and inspecting teams.
Ad-hoc members:
Quality inspectors, transport team, engineers (for repairing machines), the HR.
Approved by & date:
CEO, Operations Manager, HR.
07/02/2020
Purchase answer to see full
attachment